Stage 2 combines Network Points and Uptime Points into one USDC allocation. Grass’s allocation article gives $0.0049 USDC per Network Point and $0.00000007 USDC per Uptime Point. Network Points reflected actual bandwidth use, with a network-wide daily pool of 1 million. Uptime Points reflected availability, connection quality, location and activity bonuses. Actual bandwidth use carried the most weight. [grass-stage-2-rules]
For this finished distribution, Network Points received the standard extension rate, a 5x desktop bonus or a 10x Android bonus. Uptime bonuses of 2x for desktop and 3x for Android were already applied during Stage 2. Do not apply those uptime bonuses again to a recorded balance. The dashboard is the authority for the final allocation. These historical rates are not a promised rate for work done now.
Stage 2 pays USDC. The same rules explicitly say there are no new GRASS emissions or circulating-supply changes from this distribution, and holding GRASS does not affect eligibility. No fixed dollar return per device is promised.