← Back to active airdrops
Recorded: Confirmed rewardChecked

3Jane Airdrop: Locked JANE Rewards and Final Mint

WaitOur call

Research needs a fresh check · October 22, 2026 (UTC)

Checked October 15, 2026: 3Jane documents live locked JANE liquidity mining.

Fees
Unknown
Capital
Unknown
Time
Unknown
Risk
High

The catch: Research needs a fresh check · 2026-10-22

Keep the dated sources below for context.

Reference screenshot of the 3Jane official website
Screenshot · August 28, 2026 · www.3jane.xyz

Keep your next move open

Checked October 15, 2026: 3Jane documents live locked JANE liquidity mining. Daily balance snapshots determine accrual, and emissions are claimable weekly.

Your kind of farm if: Experienced credit-protocol users who can assess capital losses and locked-token risk.

Sit this out if: You need a verified live claim or a guaranteed cash return, or would take financial risk solely for rewards.

More · Deadline, wallet and limits
Deadline
Not announced
Repeat
Recheck official terms at the next review date and before any wallet transaction.
Wallet
Wallet required
KYC
Unknown
Difficulty
Beginner
Location
Check official terms
  • A directory listing is not a guaranteed reward, allocation, or claim window.
  • Wallet connections and token approvals can create loss or phishing risk.
  • Campaign terms, geography restrictions, fees, and required capital may change or be undisclosed.
  • Live X timeline fetch was unavailable in this run; `xurl` is unauthenticated (no registered app) on this machine, so `@3janexyz` activity was reconstructed from web-search snippets rather than an ordered timeline.
  • No specific smart-contract audit firm or audit date has been verified; the public CertiK Skynet profile (score 71.53/100) is not equivalent to a published audit report.
  • CertiK Skynet score has slipped 71.53 -> 66.09 between refreshes and the project is still labeled "Pre-Launch" by CertiK; no firm-issued audit report has been published, so the security-review depth is unverified.
  • Live X timeline fetch was unavailable in this run; `xurl` is still unauthenticated (no registered app) on this machine, so `@3janexyz` activity was reconstructed from web_search snippets rather than an ordered timeline.

Recorded task reference

Before you start
  • Use a self-custody wallet only if the official campaign requires one; never share a seed phrase.
  1. Review the eligible farms, daily balance rules and JANE lock terms before choosing whether to supply capital.

    docs.3jane.xyz · Lock · Verified October 15, 2026

    Fee
    Fee not estimated
    Capital
    Capital not stated
    Stop if
    The wallet prompt or domain does not match this receipt.
    Historical / research reference: docs.3jane.xyz ↗
Sources & checks 21 sources · Checked October 15, 2026

high confidence · 100% coverage · Full dossier

Sources

  1. 3Jane official website ↗Source · SourceChecked August 11, 2026
  2. Airdrops.com directory listing ↗Source · SourceChecked August 11, 2026
  3. 3Jane Introduction docs ↗3Jane Protocol · Official DocsChecked August 11, 2026
  4. Paradigm leads $5 million seed round in crypto credit startup 3Jane ↗The Block · PressChecked August 11, 2026
  5. Coinbase Ventures Recent News & Activity (3Jane Jun 4 2025) ↗Crunchbase · Funding DatabaseChecked August 11, 2026
  6. 3Jane raised $5.2M Seed Funding on Jun 4, 2025 ↗CypherHunter · Funding DatabaseChecked August 11, 2026
  7. 3Jane — CertiK Skynet Project Insight ↗CertiK · Audit ReportChecked August 12, 2026
  8. 3Jane seed round announcement thread (@3janexyz) ↗3Jane (X / Twitter) · Official DocsChecked August 11, 2026
  9. 3Jane TVL announcement thread (@3janexyz) ↗3Jane (X / Twitter) · Official DocsChecked August 11, 2026
  10. Aave retweets 3Jane x Aave V3 integration ↗Aave / 3Jane (X / Twitter) · PressChecked August 11, 2026
  11. 3Jane Core Money Market docs ↗3Jane Protocol · Official DocsChecked August 12, 2026
  12. 3Jane Protocol whitepaper PDF ↗3Jane Protocol · Official DocsChecked August 12, 2026
  13. Unsecured Lending Agreement 3Jane - ChainCatcher ↗ChainCatcher · PressChecked August 12, 2026
  14. 3Jane protocol overview - Web3Research Global ↗Web3Research Global · PressChecked August 12, 2026
  15. Paradigm-Backed 3Jane Protocol - DeepNewz VC ↗DeepNewz VC · PressChecked August 12, 2026
  16. Ethereum Lender 3Jane Emerges From Stealth - AiCoin ↗AiCoin · PressChecked August 12, 2026
  17. 3Jane forward-flow loan sale ($8.5M) - @3janexyz ↗3Jane (X / Twitter) · Official DocsChecked August 12, 2026
  18. 3Jane JANE token supply range disclosure - @3janexyz ↗3Jane (X / Twitter) · Official DocsChecked August 12, 2026
  19. Paradigm-Backed 3Jane Protocol Launches With USD3 Stablecoin - CryptoNews ↗CryptoNews · PressChecked August 12, 2026
  20. 3Jane to Launch Mainnet Unsecured Lending Protocol - Phemex News ↗Phemex News · PressChecked August 12, 2026
  21. 3Jane Liquidity Mining ↗3Jane · Official DocsChecked October 15, 2026

Claims

  1. RewardVerified

    3Jane’s live liquidity-mining program pays locked JANE to eligible farms, including USD3, sUSD3 and specified liquidity positions. Rewards accrue from daily time-weighted balance snapshots, with new emissions claimable every seven days. The docs state that 100% of emissions go to liquidity providers until final mint, with weekly farm floors that scale as TVL goals are met. Final mint is planned for 2026, when transferability is to be enabled and final supply fixed within 1,111,111,111–6,666,666,666 JANE; no exact date is given. A fixed JANE balance therefore does not establish a fixed share of final supply or a cash value.

    Sources: 3jane-mining Recheck when: A cited project source changes the program, eligibility, claim window or reward rules.

Updates

  1. Imported from the Airdrops.com homepage directory with listed status “Active”; official reward details remain to be verified.Sources: airdrops-com-directory
  2. Refreshed via web research. Step 4 evidence came from queries 1 (X-announcement surface), 3/4 (project introduction + tech stack via docs.3jane.xyz and ChainCatcher), and 5/6 (funding + audit via The Block, Crunchbase, CypherHunter, CertiK Skynet). Step 3 X-fetch failed (xurl unauthenticated), so x_summary is built from web_search snippets of @3janexyz activity. Funding_info and project_overview rewritten with cited primary sources; score nudged 72 → 74.Sources: 3jane-docs-introduction, 3jane-funding-theblock, 3jane-funding-crunchbase, 3jane-funding-cypherhunter, 3jane-certik-skynet, 3jane-x-seed-announcement, 3jane-x-tvl-thread, 3jane-aave-integration
  3. Refreshed 2026-08-12. Step 4 evidence came from queries 1 (X announcement surface - @atoms_res reshare of @3janexyz seed and @3janexyz credit-mechanic threads), 2 (live mainnet / JANE supply-range news via CryptoNews, Phemex News, RootData), 3/4 (project introduction + tech stack via docs.3jane.xyz "Introduction" and "Core Money Market", the whitepaper PDF, and ChainCatcher / Web3Research Global architectural write-ups), 5/6 (funding via The Block, Crunchbase, CypherHunter, DeepNewz VC, AiCoin; audit via CertiK Skynet page). Step 3 X-fetch still failed (xurl unauthenticated), so x_summary is built from web_search snippets of @3janexyz. project_overview and funding_info rewritten with cited primary sources; score and tier held at 74 / B.Sources: 3jane-docs-introduction, 3jane-docs-core-money-market, 3jane-whitepaper, 3jane-chaincatcher, 3jane-web3research, 3jane-funding-theblock, 3jane-funding-crunchbase, 3jane-funding-cypherhunter, 3jane-funding-deepnewz, 3jane-funding-aicoin, 3jane-certik-skynet, 3jane-x-seed-announcement, 3jane-x-tvl-thread, 3jane-x-loan-sale, 3jane-x-jane-supply, 3jane-aave-integration, 3jane-cryptonews-launch, 3jane-phemex-mainnet
  4. Replaced generic holding copy with primary-source reward mechanics and reviewed claim availability, campaign status and search copy. Checked October 15, 2026: 3Jane documents live locked-JANE liquidity mining. Daily balance snapshots determine accrual, and emissions are claimable weekly. Final supply and transferability depend on a planned 2026 final mint with no exact date published in these rules.Sources: 3jane-mining
Context Project, team, campaigns and FAQ

What it is

What it does
3Jane is a peer-to-pool credit-based money market on Ethereum, built as a modified Morpho Blue instance, that issues uncollateralized USDC credit lines to U.S.-resident cryptonative borrowers underwritten against onchain credit scores (Cred Protocol, Blockchain Bureau) and offchain VantageScore 3.0 / Plaid bank-account data attested through Reclaim-protocol zkTLS and EigenLayer-attested verifiers; supplier USDC is tranched into senior USD3 and junior sUSD3, with idle capital routed to Aave V3.
Who uses or pays
Who uses and pays for the product still needs verification.
What is live
The current live product state is not yet recorded separately from campaign research.
Where value flows
The company reported a $5.2M seed round on June 4, 2025, led by Paradigm with participation from Coinbase Ventures, Robot Ventures, Wintermute Ventures, Bodhi Ventures, Breed VC, and individual backers including Andre Cronje, Kain Warwick, Joshua Lim, DeFiDad, Julian Koh, Zaheer Ebtikar, and Laurence Day [3jane-funding-theblock, 3jane-funding-crunchbase, 3jane-funding-cypherhunter]. A public CertiK Skynet profile exists (score 66.09/100 at refresh time, project still listed as "Pre-Launch"), but no specific smart-contract audit firm or audit-date publication has been verified; 3Jane documentation references EigenLayer-attested verifiers and Reclaim-protocol zkTLS proofs as the offchain trust layer rather than a traditional audit [3jane-certik-skynet, 3jane-docs-introduction].
Who controls it
Upgrade, custody, and governance control still need verification.
Why users return
Demand without incentives still needs verification.

Locked JANE liquidity mining

Open for activityCampaign
Participation starts
Not announced
Participation ends
Not announced
Snapshot
Not announced
Claim opens
Not announced
Claim closes
Not announced
Reward
Not announced

Checked October 15, 2026: 3Jane documents live locked-JANE liquidity mining. Daily balance snapshots determine accrual, and emissions are claimable weekly. Final supply and transferability depend on a planned 2026 final mint with no exact date published in these rules.

Rewards

3Jane’s live liquidity-mining program pays locked JANE to eligible farms, including USD3, sUSD3 and specified liquidity positions. Rewards accrue from daily time-weighted balance snapshots, with new emissions claimable every seven days. The docs state that 100% of emissions go to liquidity providers until final mint, with weekly farm floors that scale as TVL goals are met. Final mint is planned for 2026, when transferability is to be enabled and final supply fixed within 1,111,111,111–6,666,666,666 JANE; no exact date is given. A fixed JANE balance therefore does not establish a fixed share of final supply or a cash value.

Cost to play

Supplying capital exposes users to credit losses and smart-contract risk. sUSD3 is the junior first-loss tranche. JANE rewards remain locked until final mint, and neither final supply share nor cash value is fixed. Transaction fees and the capital needed for a chosen farm must be checked before depositing.

Edge

  • Follow published official terms only; do not assume ordinary product use qualifies for a reward.

About 3Jane

3Jane is a peer-to-pool credit-based money market on Ethereum, built as a modified Morpho Blue instance, that issues uncollateralized USDC credit lines to U.S.-resident cryptonative borrowers underwritten against onchain credit scores (Cred Protocol, Blockchain Bureau) and offchain VantageScore 3.0 / Plaid bank-account data attested through Reclaim-protocol zkTLS and EigenLayer-attested verifiers; supplier USDC is tranched into senior USD3 and junior sUSD3, with idle capital routed to Aave V3.

Score notes

  • 3Jane documentation describes recurring $JANE liquidity-mining emissions, but participation requires capital and exposes users to protocol and credit risk.
  • Confirmed $5.2M seed round (Jun 4, 2025) led by Paradigm with Coinbase Ventures, Robot Ventures, Wintermute Ventures, Bodhi Ventures, Breed VC, and named DeFi-builder angels including Andre Cronje, Kain Warwick, Joshua Lim, DeFiDad, Julian Koh, Zaheer Ebtikar, and Laurence Day; tier bumped B 72 → 74 to reflect named-tier-1 backing and a live Aave V3 integration, while leaving the no-allocation verdict intact.
  • Re-ranked 2026-08-12: confirmed $5.2M Paradigm-led seed (Jun 2025) with the full angel list (Andre Cronje, Kain Warwick, Joshua Lim, DeFiDad, Julian Koh, Zaheer Ebtikar, Laurence Day, etc.), a public CertiK Skynet profile still showing "Pre-Launch" at 66.09/100 (down from 71.53 last cycle), an Aave V3 integration (Nov 2025), a 2026 thread disclosing an $8.5M forward-flow loan-sale to a third-party buyer, and a JANE final-supply range of 1.111B - 6.666B tokens with 2026 mint/transfers disclosed but no allocation rule. Score held at 74 / tier B - solid signal but no published audit report, no allocation, no checker, and no live X access.

Reward review 2026-10-15: Only consider JANE mining if you accept credit exposure, locked rewards and uncertain final supply. Locked JANE emissions; final supply share and cash value are uncertain. Existing numerical score retained; it is not an estimate of reward value.

Questions

How does the 3Jane reward work?

3Jane’s live liquidity-mining program pays locked JANE to eligible farms, including USD3, sUSD3 and specified liquidity positions. Rewards accrue from daily time-weighted balance snapshots, with new emissions claimable every seven days. The docs state that 100% of emissions go to liquidity providers until final mint, with weekly farm floors that scale as TVL goals are met. Final mint is planned for 2026, when transferability is to be enabled and final supply fixed within 1,111,111,111–6,666,666,666 JANE; no exact date is given. A fixed JANE balance therefore does not establish a fixed share of final supply or a cash value.

Can I claim the 3Jane airdrop now?

Checked October 15, 2026: 3Jane documents live locked-JANE liquidity mining. Daily balance snapshots determine accrual, and emissions are claimable weekly. Final supply and transferability depend on a planned 2026 final mint with no exact date published in these rules.

Find my next farm →